View Issue Details

IDProjectCategoryView StatusLast Update
0002023T99X171.00 SKB EagleGeneralpublic2025-07-04 16:57
Reporter(ALTech) SH Son Assigned To(PM) Roisy Liang Due Date
PrioritynormalSeveritys4-minorReproducibilityhave not tried
Status closedResolutionfixed 
Summary0002023: [Eagle] 2024.12 Monthly RMA_KR (Lot 22) shipping list
Description[Eagle] 2024.12 Monthly RMA_KR (Lot 22) shipping list
TagsNo tags attached.
Attach Tags

Relationships

related to 0001690 new [Eagle] RMA status 
related to 0002024 feedback(MFG) Rachel Ruan [EAGLE] 2024.12 Mass production inspection Report 

Users monitoring this issue

Activities

(ALTech) SH Son

2025-01-09 14:16

developer   ~0017242

Hi Roisy,

this is list of 2024.12 Monthly base RMA.
Please check and feedback within 2days(01/11).
If there is no response within 2 days, this lot will be considered in of warranty.

Thanks
SON
image.png (26,730 bytes)   
image.png (26,730 bytes)   

(PM) Roisy Liang

2025-01-17 11:33

developer   ~0017265

Dear Mr.SON,

Sorry for missing your Mantis. I checked data list of 169pcs RMA lot and see that: having one SN not having data on the system. Please help me check SN: 2149688001201404449199  
We only can check data of SN: 2149688001202404449199
Please help me check: the correct SN is: 2149688001201404449199   or        2149688001202404449199

Many thanks,
Roisy
image-2.png (869 bytes)   
image-2.png (869 bytes)   
image-3.png (847 bytes)   
image-3.png (847 bytes)   

(ALTech) SH Son

2025-01-17 13:27

developer   ~0017266

Hi Roisy
It was my typo.
2149688001202404449199 is correct


Thanks
SON

(PM) Roisy Liang

2025-01-17 14:10

developer   ~0017267

Dear Mr.SON,

Please refer warranty time as below: all 169pcs are in of warranty. Please refer the attached file.
Let me know if you have any questions.

Thank you,
Roisy

(ALTech) SH Son

2025-01-20 14:17

developer   ~0017273

Hi Roisy

Thank you for the confirmation
here is Invoice and vessel schedule. ETD KR 1/27, ETA HK 1/31
I will update final BL soon

Thanks
SON
image-4.png (17,735 bytes)   
image-4.png (17,735 bytes)   

(ALTech) SH Son

2025-02-03 11:54

developer   ~0017305

Hi Roisy

here is final BL

please refer to the attachment file

Thanks
SON

(ALTech) SH Son

2025-02-10 14:32

developer   ~0017313

Hi Roisy

Please update this lot status

ETA Factory
ETD (after RMA) Factory

Thanks
SON

(PM) Roisy Liang

2025-02-26 11:16

developer   ~0017359

Hi Mr.SON,

RMA lot 22 will be ETA the factory 3rd March. And this lot will be repaired with RMA lot 21. The shipment will be ETD with RMA lot 21 in early April and will update detail vessel schedule
as soon as we receive from fwd.
Let me know if you have any questions.

Thank you!

(PM) Roisy Liang

2025-04-15 17:25

developer   ~0017487

Hi Mr.SON,

We already reworked RMA lot 21 & 22. Please kindly check FA report and scrap report as the attached file.
If no having any issue, please confirm to us for the shipment.

Thanks,
Roisy

(PM) Roisy Liang

2025-04-15 17:27

developer   ~0017488

Hi Mr.SON,

We already reworked RMA lot 21 & 22. Please kindly check FA report and scrap report as the attached file.
If no having any issue, please confirm to us for the shipment.

Thanks,
Roisy

(ALTech) SH Son

2025-04-16 12:11

developer   ~0017490

Hi Roisy

Confirm the FA report of 178pcs and 90pcs scrap list
please prepare the shipment of 268pcs expect below STB.

this STB need to additional defect analysis is required
"2149688001202404122919 2C9811A5F077 YZV00B6"

As picture symptoms are different from general burnt and may progress to a serious problem.

First, please report the visual Inspection and Basic Electrical Testing to find out which component is causing it.


Thanks
SON
image-5.png (454,734 bytes)

(MFG) Rachel Ruan

2025-04-18 16:39

developer   ~0017492

Dear Mr Son

Related to "2149688001202404122919 2C9811A5F077 YZV00B6" Scrap issue.

Please review FA report on 01 pcs of waste report.

Many thanks
Rachel

(ALTech) SH Son

2025-04-21 14:34

developer   ~0017494

Hi Rachel
Could you please add the rear side picture?


Thanks
SON

(MFG) Rachel Ruan

2025-04-21 17:47

developer   ~0017495

Dear Mr Son

Pls help review connecter side picture of 2149688001202404122919.


Many thanks
Rachel

(ALTech) SH Son

2025-04-22 13:10

developer   ~0017498

Hi Rachel

Thank you for the update.
BFX AT-100_FA_1pc scrap 2149688001202404122919 is approved.

@Roisy
Please ship RMA lot 21 & 22 to Korea and update shipping schedule and documents.

Thanks
SON

(PM) Roisy Liang

2025-04-24 18:31

developer   ~0017510

Dear Mr.SON,
I would like to send you shipping document and shipping plan of RMA lot 21&22. This shipment will be delivered by air method. Please kindly check and let me know if you have any questions:

ETD VN: 26th April
ETA KOREA: 04:35 pm_VN time 26th April

Many thanks,
Roisy

Issue History

Date Modified Username Field Change
2025-01-09 14:15 (ALTech) SH Son New Issue
2025-01-09 14:15 (ALTech) SH Son Issue Monitored: (ALTech) BY Lee
2025-01-09 14:15 (ALTech) SH Son Issue Monitored: (ALTech) JW Kim
2025-01-09 14:15 (ALTech) SH Son Issue Monitored: (ALTech) Lonnie Kim
2025-01-09 14:15 (ALTech) SH Son Issue Monitored: (ALTech) SH Son
2025-01-09 14:15 (ALTech) SH Son Issue Monitored: (ALTech) Sophie Lee
2025-01-09 14:15 (ALTech) SH Son Issue Monitored: (ALTech) Sun Choul Joung
2025-01-09 14:15 (ALTech) SH Son Issue Monitored: (ALTech) SY Yoon
2025-01-09 14:15 (ALTech) SH Son Issue Monitored: (MFG) An Tran
2025-01-09 14:15 (ALTech) SH Son Issue Monitored: (PM) Roisy Liang
2025-01-09 14:15 (ALTech) SH Son Issue Monitored: (PM) Sheila Tu
2025-01-09 14:15 (ALTech) SH Son Issue Monitored: (PM) Tiffanie Lai
2025-01-09 14:15 (ALTech) SH Son Issue Monitored: (Sales) Miya Wang
2025-01-09 14:15 (ALTech) SH Son Relationship added related to 0001690
2025-01-09 14:16 (ALTech) SH Son Note Added: 0017242
2025-01-09 14:16 (ALTech) SH Son File Added: image.png
2025-01-09 14:16 (ALTech) SH Son File Added: 20250109_169PCS FORMAT RMA.xlsx
2025-01-09 14:18 (ALTech) SH Son Assigned To => (PM) Roisy Liang
2025-01-09 14:18 (ALTech) SH Son Status new => assigned
2025-01-09 14:21 (ALTech) SH Son Relationship added related to 0002024
2025-01-17 11:33 (PM) Roisy Liang Note Added: 0017265
2025-01-17 11:33 (PM) Roisy Liang File Added: image-2.png
2025-01-17 11:33 (PM) Roisy Liang File Added: image-3.png
2025-01-17 13:27 (ALTech) SH Son Note Added: 0017266
2025-01-17 14:10 (PM) Roisy Liang Note Added: 0017267
2025-01-17 14:10 (PM) Roisy Liang File Added: 20250109_169PCS FORMAT RMA-2.xlsx
2025-01-20 14:17 (ALTech) SH Son Note Added: 0017273
2025-01-20 14:17 (ALTech) SH Son File Added: 20250117 BFX-AT100_Lot22_Invoice 선적서류_new.xls
2025-01-20 14:17 (ALTech) SH Son File Added: image-4.png
2025-02-03 11:54 (ALTech) SH Son Note Added: 0017305
2025-02-03 11:54 (ALTech) SH Son File Added: FIHKG250030 FIHKG250030.pdf
2025-02-10 14:32 (ALTech) SH Son Note Added: 0017313
2025-02-26 11:16 (PM) Roisy Liang Note Added: 0017359
2025-04-07 09:24 (SW) Willin Deng Severity s2-severe => s4-minor
2025-04-15 17:25 (PM) Roisy Liang Note Added: 0017487
2025-04-15 17:27 (PM) Roisy Liang Note Added: 0017488
2025-04-15 17:27 (PM) Roisy Liang File Added: 91pcs scrap RMA T99x171.00.xlsx
2025-04-15 17:27 (PM) Roisy Liang File Added: FA report of 269psc RMA-T99X171 ver1.xlsx
2025-04-16 12:11 (ALTech) SH Son Note Added: 0017490
2025-04-16 12:11 (ALTech) SH Son File Added: image-5.png
2025-04-18 16:39 (MFG) Rachel Ruan Note Added: 0017492
2025-04-18 16:39 (MFG) Rachel Ruan File Added: BFX AT-100_FA_1pc scrap 2149688001202404122919 .pptx
2025-04-21 14:34 (ALTech) SH Son Note Added: 0017494
2025-04-21 17:47 (MFG) Rachel Ruan Note Added: 0017495
2025-04-21 17:47 (MFG) Rachel Ruan File Added: Connecter Image 2149688001202404122919.jpeg
2025-04-22 13:10 (ALTech) SH Son Note Added: 0017498
2025-04-24 18:31 (PM) Roisy Liang Note Added: 0017510
2025-04-24 18:31 (PM) Roisy Liang File Added: Invoice&packing list of 100pcs RMA T99X171 .xls
2025-04-24 18:31 (PM) Roisy Liang File Added: Invoice&packing list of 169pcs RMA T99X171.xls
2025-07-04 16:57 (PM) Sheila Tu Status assigned => closed
2025-07-04 16:57 (PM) Sheila Tu Resolution open => fixed